FeatureImagePlaceholder

 

Project: Flood Control Channelization for the Morris River
Location: Rosenort, Manitoba
Description: Construction of a diversion channel, dykes and three small dams totaling 2.2 million cubic meters of excavation and fill. Two concrete control structures were installed. Notable that upon review of the project, KPCL proposed an alternative construction methodology that significantly improved productivity and completion of the project.
Owner: Southern Manitoba Red River Flood Protection
Completion Date: 2001 to 2002
Prime Contractor: Kelly Panteluk Construction Ltd.